|
||||||
|
Tips & Ideas Flooring
Ceramic Tiles
Laying Tiles Around Obstacles - Over The Water Drain
Easy Medium Hard
Intermediate carpentry skills
Experienced - 30 min.
Handy - 1 hr. Beginner - 1,5 hrs. per tile - around the water drain Steps
1.
2.
Marking the measurements: We now mark the taken measurements by adding 1 cm. extra for it will be filled with grout later on.
3.
Cutting the tile: Let’s place the tile face-up in the tile cutter and align the traced cutting line with the guide on the cutter and let’s
pull the handle towards ourselves.
4.
Breaking the tile with pincers: Let’s break bits of the tile with pincers until we reach the section that has been traced and cut with the tile cutter.
5.
|
||||||
| Home > TIPS&IDEAS > Flooring > Laying Tiles Around Obstacles - Over The Water Drain | Legal Information Sitemap Contact | |||||